Services Gallery Why Trifecta Reviews Get Free Estimate
๐Ÿ 

Interior Painting

A wall repaint isn't just about color โ€” it's about what happens before the roller ever touches the surface. Cracks, nail holes, and old caulk lines telegraph right through a fresh coat if they aren't addressed first.

  • 01

    Protect & Prep the Space

    Floors, furniture, and fixtures are covered before anything else happens. Walls and trim are inspected for cracks, nail pops, and gaps.

  • 02

    Caulk & Prime

    Gaps at trim, baseboards, and joints are caulked, and any patched, repaired, or stained areas are spot-primed before color goes on โ€” this is what keeps seams and repairs from showing through later.

  • 03

    Two Full Coats, Always

    Every interior job gets two complete coats โ€” no exceptions. A single coat may look fine under bright lights on day one, but it wears unevenly and shows roller marks and touch-ups much faster.

  • 04

    Sheen Matched to Surface

    Walls are typically finished in satin for a durable, washable surface with a soft look. Trim gets semi-gloss for definition and durability โ€” or high-gloss on trim in historic homes, where a traditional glossy finish is period-appropriate.

Common Misconception

"It's just a wall โ€” how hard can it be?" A wall is only as good as what's underneath it. Skipping caulk and spot-priming is the single biggest reason interior paint jobs look great for a month and then start showing cracks and seams within the year.

At a Glance

Paint Sherwin-Williams
(product selected per job)
Wall Sheen Satin
Trim Sheen Semi-Gloss
(High-Gloss on historic trim)
Coats 2, always
Prep Caulk + spot-prime
on all repairs
PCA Standard: Follows PCA guidance on surface preparation levels and caulk placement (Standards P14 & P11) to ensure a properly adhered, long-lasting finish.
๐Ÿก

Exterior Painting

Exterior paint isn't decoration first โ€” it's your home's weatherproofing barrier. In Louisville, that means planning around rain, humidity near the river, and summer heat, not just picking a color.

  • 01

    Full Pressure Wash

    Every exterior job starts with a full pressure wash to remove dirt, mildew, and loose paint โ€” a clean, sound surface is non-negotiable for adhesion.

  • 02

    24-Hour Dry Time

    After pressure washing โ€” or any rain โ€” we always allow a full 24 hours of dry time before painting. Painting over damp siding traps moisture underneath the finish and causes premature peeling.

  • 03

    Damage Assessment

    Minor imperfections are caulked and primed like any repair. If we find rot or structural wood damage beyond what paint can address, we'll flag it and bring in a contractor to fix it properly before we paint โ€” painting over rot only hides the problem temporarily.

  • 04

    Weather-Smart Scheduling

    Humidity isn't usually a major issue here, but we avoid painting surfaces once they get above roughly 95ยฐF, and we schedule around the sun โ€” working the shaded side of the house at the right time of day rather than fighting direct heat.

  • 05

    Two Full Coats, Always

    Same standard as interior work โ€” two complete coats of a Sherwin-Williams exterior product selected for the specific substrate and job.

Common Misconception

"One thick coat should cover it." Exterior surfaces take the hardest beating of anything on your home โ€” sun, rain, freeze-thaw cycles. A single heavy coat cracks and fails faster than two properly applied coats, and it won't protect the wood underneath nearly as long.

At a Glance

Paint Sherwin-Williams
(product selected per job)
Prep Full pressure wash
Dry Time 24 hrs minimum after
rain or washing
Temp Limit Avoid surfaces above
~95ยฐF when possible
Coats 2, always
Major Damage Referred to a contractor
before painting
PCA Standard: Pressure washing and dry-time practices follow PCA guidance on pressurized water surface cleaning (Standard P22).
๐Ÿชš

Cabinet Painting

Cabinets get touched, wiped down, and slammed shut every single day โ€” a wall-paint approach won't hold up. This is a furniture-grade finish, not a room repaint, and it's treated that way from start to finish.

  • 01

    Doors & Drawers Removed

    Depending on the scope of the job, doors and drawer fronts are often removed and sprayed separately โ€” sometimes on-site, sometimes off-site โ€” to get full, even coverage into every corner and profile.

  • 02

    Sand, Clean & Prep

    Surfaces are properly sanded and cleaned to give the new finish something to grip โ€” factory finishes and old paint are naturally glossy and need to be broken down before anything new is applied.

  • 03

    Sprayed for a Factory Finish

    We spray rather than brush or roll to eliminate visible brush strokes and get the smooth, factory-style result cabinets are known for.

  • 04

    Two Coats of Gallery Series

    We use Sherwin-Williams Gallery Series โ€” a cabinet-specific enamel built for daily wear โ€” applied in two full coats for durability and a consistent, hard finish.

  • 05

    A Full Week, Start to Finish

    A standard kitchen cabinet job typically runs a full week. That covers prep, spraying, proper dry time between coats, and reinstalling doors and hardware โ€” rushing any of those steps is where cabinet jobs go wrong.

Common Misconception

"Cabinets are just small walls." Cabinets are the highest-touch, highest-wear surface in your home. Wall paint and a roller will chip and peel at the hinges and handles within months โ€” a proper cabinet-grade enamel and spray application is what makes the finish actually hold up.

At a Glance

Paint Sherwin-Williams
Gallery Series
Application Sprayed
(on-site or off-site, job dependent)
Coats 2, always
Typical Timeline 1 full week
PCA Standard: Surface preparation and finish quality are held to PCA's "properly painted surface" benchmark (Standard P1) โ€” free of drips, runs, and uneven sheen.
๐ŸŒฟ

Deck & Fence Staining

Staining isn't painting. Stain needs to soak into the wood, not just sit on top of it โ€” which changes how it's applied, how the wood is prepped, and how often it needs to be redone.

  • 01

    Pressure Wash When Needed

    Decks and fences are pressure washed as needed to strip away dirt, mildew, and any failing old stain before we start โ€” a clean surface lets new stain penetrate evenly.

  • 02

    Full Dry Time

    Same rule as our exterior painting work โ€” a full 24 hours after washing or rain before any stain goes on. Wood that isn't fully dry won't absorb stain properly.

  • 03

    Any Stain Type, Your Choice

    We're not limited to one product โ€” solid, semi-transparent, or clear/transparent stains are all options, chosen based on the look you want and the condition of the wood.

  • 04

    Brush-Applied, Not Sprayed

    Stain is brushed on by hand to work as much material into the pores of the wood as possible โ€” this is the biggest difference from painting, and it's what gives the wood real, lasting protection instead of a thin surface film.

Common Misconception

"Stain lasts as long as paint." It doesn't, and it isn't supposed to. Stained wood breathes and weathers naturally โ€” expect to recoat roughly every 2โ€“3 years, sooner if your deck or fence sits in full sun or close to the river where moisture exposure is higher.

At a Glance

Stain Types Solid, semi-transparent,
or clear/transparent
Prep Pressure washed
as needed
Dry Time 24 hrs minimum after
rain or washing
Application Brush-applied by hand
Recoat Interval Every 2โ€“3 years
(sun & moisture dependent)
PCA Standard: Stain selection and application follow PCA guidance for specifying stain and clear coatings on wood surfaces (Standard P21).
๐Ÿงป

Wallpaper Installation

Wallpaper isn't a big sticker you measure, cut, and stick on. It's an exact, methodical craft โ€” because unlike paint, wallpaper doesn't hide an imperfect wall. It highlights one. Installation for every job is coordinated by Trifecta and completed by a dedicated wallpaper installation specialist we partner with directly, so you get true paperhanging-level precision without managing multiple contractors yourself.

  • 01

    Smooth the Surface First

    Nail pops, texture, and drywall seams telegraph straight through wallpaper. Walls are skim-coated where needed and sanded smooth โ€” the goal is a surface with zero texture for the paper to reveal.

  • 02

    Prime With the Right Product

    Paint primer isn't wallpaper primer. A proper wallcovering primer/sizing is applied and given a full dry window before any paper goes up โ€” it controls adhesion and, just as important, keeps the paper removable down the road without tearing the drywall.

  • 03

    Laser-Level Plumb Line, Not the Corner

    No wall or corner is perfectly square โ€” most are off by a noticeable margin once you measure them. Starting from a laser-established true plumb line, instead of trusting the corner, is what keeps the pattern running straight across every wall in the room instead of drifting out of alignment by the last strip.

  • 04

    Pattern Repeat, Planned Before Cutting

    Strips are measured and sequenced ahead of time to account for the pattern repeat, so seams match cleanly and focal points โ€” like above a fireplace or centered on a wall โ€” land exactly where they should, not wherever the roll happened to run out.

  • 05

    Hang, Smooth, Seam, Trim

    Each strip is set to the plumb line and smoothed from the center outward to push air bubbles to the edges. Seams are rolled once the adhesive sets slightly โ€” rolling too early squeezes out paste and can stain the paper โ€” then excess is trimmed clean at the ceiling and baseboard.

Common Misconception

"If the wall looks straight, it is straight." Almost no wall in a real home is perfectly square โ€” drywall settles, corners shift, and the difference is often invisible to the eye but very visible once a repeating pattern is running up it. That's why the wall itself gets checked and referenced with a laser level before the first strip ever goes up, not eyeballed.

At a Glance

Prep Skim-coated, sanded smooth
+ wallcovering primer
Alignment Laser-level plumb line
(not the corner)
Pattern Matching Repeat measured &
sequenced before cutting
Seams Butted & rolled,
never overlapped
Installation Coordinated by Trifecta,
hung by our specialist partner
Industry Standard: Installation follows Wallcovering Installers Association (WIA) best practices for surface preparation and true-plumb strip alignment.

Ready to Do It Right?

Get a free, same-day estimate โ€” and a team that treats prep and process as seriously as the paint itself.